NASA prepares launch of Artemis II with four astronauts towards the far side of the moon in April

Nasa completes the final preparations for the launch of the Artemis II mission, scheduled to take place on April 1st from Centro Espacial Kennedy, at Flórida, with local time at Estados Unidos. Quatro astronauts will board the Orion spacecraft attached to the Space Launch System rocket (SLS) to fly over the far side of Lua on a journey lasting approximately 10 days. Esta will be the first manned mission of the Artemis program and the return of humans to the proximity of Lua after more than five decades since Apollo 17 in 1972.
The international crew includes Commander Reid Wiseman, Pilot Victor Glover, Mission Specialist Christina Koch and Mission Specialist Jeremy Hansen from Agência Espacial Canadense. Wiseman accumulates experience in Estação Espacial Internacional and in spacewalks. Glover also has a history on the ISS and will become the first black astronaut to travel to deep space. Koch holds the record for the longest stay in space by a woman, at 328 days. Hansen will be the first Canadian to participate in a lunar mission.
- Reid Wiseman serves as mission commander
- Victor Glover serves as pilot
- Christina Koch and Jeremy Hansen complete the team as mission specialists
Astronauts will perform the most distant flight of Terra in the history of manned human exploration. The trajectory will take the spacecraft to a distance of more than 400,000 kilometers from Terra, especially with Lua close to apogee during the launch period. The mission will test life support, navigation and communications systems in deep space conditions before subsequent missions.
SLS Rocket Details and Launch Sequence
The SLS rocket, measuring approximately 98 meters tall, represents the most powerful launch vehicle ever developed by Nasa for manned missions. The central stage carries around 2 million liters of liquid hydrogen and 740 thousand liters of liquid oxygen, powering four RS-25 engines that generate around 770 tons of thrust. Dois laterally positioned solid-fuel rocket boosters contribute approximately 1,500 tons of thrust each, bringing total liftoff thrust to more than 8 million pounds.
After ignition, the vehicle ascends quickly and separates the solid boosters after about two minutes. The core stage operates for approximately eight minutes before detaching. The upper stage performs additional burns to insert Orion into high Earth orbit. Two days after launch, the European service module performs the translunar injection, directing the spacecraft toward Lua.
Nasa made adjustments to the rocket after transfer to the launch pad in January, including corrections to helium supply systems in the upper stage. The vehicle returned to Edifício of Montagem of Veículos for checks and is now positioned for the April 1-6 launch window.
We’re flying around the Moon. Come watch with us.
— NASA (@NASA)March 25, 2026
Live coverage of Artemis II prelaunch activities begins Friday, March 27, when the crew arrives at@NASAKennedy. Here’s the full Artemis II event schedule — keep checking back for the latest updates:https://t.co/jroi7BTUA5 pic.twitter.com/9DDkjTdt3K
Crew profile and accumulated experience
Reid Wiseman and Victor Glover bring luggage from previous flights on Estação Espacial Internacional, with specific training for deep space operations. Christina Koch contributes expertise in systems engineering and science, in addition to his extensive stay in orbit. Jeremy Hansen, pilot of Força Aérea Canadense, adds an international perspective to the Artemis program, which involves global partnerships.
These four crew members join the restricted group of just 24 people who have traveled beyond low Earth orbit towards Lua. The Artemis II mission marks the first human flight with the SLS and the Orion, following the successful unmanned test of the Artemis I, which used dummies to assess radiation and other environmental factors.
The crew will perform manual piloting activities on the Orion after separation from the upper stage, including simulated docking training. Esses procedures prepare for future operations involving lunar landing modules developed by commercial partners.
Observation of the far side of the moon and scientific aspects
On the fifth day of the mission, astronauts will fly over the far side of Lua at an altitude of approximately 7,400 kilometers above the surface, higher than the Apollo missions. Essa trajectory allows the visualization of a vast area illuminated by Sol, including geological formations such as Bacia Orientale and Bacia Polo Sul-Aitken, some of the oldest craters in the solar system.
During the passage to the far side, communication with Terra will be interrupted for 30 to 50 minutes due to lunar obstruction. Astronauts will observe regions composed mainly of ancient anorthosite crust, rich in plagioclase, contrasting with the basaltic seas on the visible side. Geólogos from Nasa highlight the scientific potential of direct human observations, which complement data from automated probes by capturing nuances of color, reflectivity, and lighting.
Lua preserves geological records of ancient events in the solar system, erased in Terra by processes such as erosion and plate tectonics. The Artemis II mission collects visual and experiential data that support analyzes of planetary formation and late bombardment history.
Risks and challenges of deep space journey
Extreme distance introduces specific challenges for life support systems, radiation protection, and atmospheric reentry. The Orion spacecraft will face reentry speeds approaching 40,000 kilometers per hour and temperatures of up to 1,650 degrees Celsius. Ajustes at the re-entry angle aim to mitigate problems identified in the heat shield during Artemis I, such as material detachment.
The capsule will decelerate with parachute in stages before landing at Oceano Pacífico, close to the coast of San Diego, at Califórnia. Equipes rescue teams will be positioned to recover the crew at the end of the 10 days. Engenheiros monitor all systems to ensure redundancy in case of anomalies during the ascension, translunar and return phases.
Preparation for subsequent missions of the Artemis program
The Artemis II serves as a critical test of hardware and procedures before more complex steps. Nasa has updated the program timeline, with Artemis III now planned for mid-2027 as a low-Earth orbit mission to validate dockings with lunar landers from partners such as SpaceX and Blue Origin.
Artemis IV, scheduled for 2028, aims for the first manned landing on the lunar surface since the Apollo era. Essas progressive missions build capabilities for a sustainable presence on Lua, including testing in-orbit refueling and advanced life support systems. The program paves the way for future exploration toward Marte and other destinations in the solar system.
The successful execution of Artemis II validates the SLS as a human launch vehicle and the Orion as a spacecraft for long-duration missions. Equipes continues to refine operations on Centro Espacial Kennedy to ensure alignment with launch windows and weather conditions.






