Justiça of Rio of Janeiro annulled four environmental fines totaling R$16 million imposed on player Neymar by Prefeitura of Mangaratiba. The decision was handed down last Friday, March 27, by Vara Única from Comarca from the municipality. Judge Richard Robert Fairclough signed the sentence declaring the infraction notices related to the renovation carried out in the athlete’s mansion null and void.

Publicidade

The action involved the transformation of an existing ornamental lake into a high-end swimming pool. The player’s defense argued that the intervention took place in a private area, with no significant polluting potential and no requirement for prior environmental licensing. The sentence considered that there was no proof of environmental damage or irregularities that would justify the penalties imposed.

  • The work was completed in approximately ten days after the landscaping interventions began.
  • City hall inspectors closed the place in June 2023, citing lack of a license.
  • Four infraction notices were issued days later, totaling the total value of the fines.

Property renovation details

Neymar acquired the property in February 2023 and began adaptation works months later. The project included the adaptation of a concrete lake already present on the land, with improvements to the surrounding landscaping. The company responsible for execution even released images of the completion on social media.

Publicidade

The closure occurred after a complaint and municipal inspection. The inspectors pointed out alleged irregularities in the intervention without due environmental authorization. The defense maintained that it was just a renovation in an already consolidated area, without expansion or changes that would have a relevant impact on the environment.

Analysis of the court sentence

The judge understood that the municipality did not present sufficient technical reports to prove environmental damage. The decision highlighted the lack of concrete evidence of a negative impact caused by the work. Além In addition, the judge observed that Instituto Estadual of Ambiente (Inea) did not demonstrate an omission that would legitimize the direct action of the city hall.

The sentence highlighted flaws in the administrative process conducted by the municipality. Não The need for a specific environmental license for the adaptation carried out was proven. As a result, Justiça determined the full nullity of the four infraction notices applied.

Positioning of the defense and the municipality

The legal team at Neymar argued from the beginning that the intervention was not polluting in nature. The lawyers presented technical arguments about the private nature of the reform and the lack of environmental risk. The court decision fully accepted these points when extinguishing the charges.

Prefeitura of Mangaratiba can still appeal the sentence. Até At the moment, there is no official statement on the next steps in the case. The municipality’s order to pay procedural costs and legal fees is also part of the decision.

Publicidade

Context of environmental fines

The penalties were applied in June 2023, shortly after the work was banned. The high values ​​resulted from four different infractions related to execution without a license. Justiça had already suspended the charge in 2024, and now the sentence has made the annulment definitive.

The case gained national attention as it involved the player and a property at Costa Verde in Rio de Janeiro. The mansion at Mangaratiba has undergone several interventions since its acquisition by the athlete. The current decision closes one of the open legal fronts on the topic.

Technical aspects considered by the judge

The judge analyzed reports and documents presented by the parties during the process. The lack of proof of concrete damage weighed on the final assessment. The judge also considered the proportionality of the fines in relation to the intervention carried out.

The ruling reinforced that renovations in consolidated private areas do not always require extensive environmental licensing. The decision was based on technical standards and the lack of evidence of measurable environmental impact. With the declared nullity, the charges cease to exist.

Current status of the process

The definitive annulment of the fines represents a victory for the player’s defense. The case continued for almost three years until the sentence was reached to eliminate the penalties. Prefeitura of Mangaratiba was also ordered to pay legal costs.

Neymar continues with other demands on Justiça related to the same property, including a labor lawsuit against a former employee. The environmental case, however, comes to an end with a favorable decision. The mansion remains free for use without the previous sanctions.

Justiça of Rio of Janeiro considered that the municipality did not adequately demonstrate the alleged irregularities. The lack of robust technical reports and the lack of proven damage were decisive for the annulment. The decision maintains the understanding that the work did not constitute a serious environmental infraction.

Notícias relacionadas

Mais lidas

  1. Benefícios

    Prazo da primeira parcela do 13º salário termina em 30 de novembro com novo IR

  2. Loterias

    Aplicativo da Caixa Econômica Federal apresenta instabilidade neste domingo antes de sorteio das Loterias Caixa

  3. INSS

    Reajuste do INSS 2027 corrige benefícios acima do piso pelo INPC e pode elevar teto a R$ 8.933,23 no país

  4. Benefícios

    Sistemas da Caixa fora do ar: falha afeta Caixa Tem, FGTS e Loterias no Brasil e banco retoma acesso

  5. Pis-Pasep

    Salário mínimo de R$ 1.741,00 eleva o abono salarial PIS/Pasep em R$ 120,00 para trabalhadores de 2025

  6. Benefícios Sociais

    Quinto dia útil de dezembro de 2026 cai no sábado (5) e fixa prazo do salário CLT no Brasil