US$500 million contract for the White House ballroom was awarded without bidding by the Trump administration

The Trump administration authorized an agreement worth up to US$500 million, without the need for a bidding process, to build a new ballroom at the White House, as reported by the North American newspaper “The Washington Post”.
In an article published last Tuesday, the 30th, the “Post” detailed that a report obtained by the publication indicated that the arrangement was made by the Executive Residence. This government department is exempt from the regulations that normally oblige federal entities to carry out public tenders and reveal details of the contracted services. The practice of contracts without bidding, although legal in certain circumstances, can raise questions about transparency and equity in the allocation of public resources.
The report also pointed out that the company Clark Construction, based in Virginia, was responsible for the project, applying a 3% profit margin on preliminary services in the East Wing. The then President of the United States, Donald Trump, would have actively participated in the negotiations for the agreement.
Donald Trump shows images of the White House ballroom project, aboard Air Force One, on March 29, 2026 — Photo: Elizabeth Frantz/Reuters
The construction of the controversial ballroom, designed by former President Donald Trump at the White House, will still take approximately two and a half years to complete. The statement was made by Trump himself on May 15, predicting the completion of the works by September 2028.
At the time, he stated that the structure “is under construction, ahead of schedule, and will be the best facility of its kind in the entire US.” In a comparative tone, he added: “China has a ballroom, and the United States should have one too!”
This project for the hall, considered one of the most extensive and expensive renovations in the history of the White House, has been the target of various criticisms. The questions arise both due to concerns about possible damage to the site’s historical heritage and the high expenses involved.
SANDRA COHEN: Trump pushes the envelope by promoting his controversial ballroom after failed assassination attempt
In October, a wing of the official residence was demolished on Trump’s orders to make way for the new structure. The Court even intervened, suspending the work, but the decisions were overturned by the North American government. The project plan also includes the creation of an underground bunker, capable of resisting different types of weapons.
The renovation of the ballroom is part of a broader Trump initiative to revitalize the city of Washington. Other ambitious proposals included building a 250-foot arch, remodeling the reflecting pool on the National Mall, and creating a new boardwalk near the Lincoln Memorial.
Previously, the former president had assured that financing for the ballroom would come from himself and wealthy donors. However, he later asked Congress for US$1 billion in taxpayer resources to pay for security improvements, a request denied by Republican senators, concerned about the midterm elections that would take place in November.
In May, Trump announced that the final cost of the hall would be higher than initially predicted, estimating a value close to US$400 million (equivalent to around R$1.95 billion). This amount represented twice what had been initially estimated for the construction that generated controversy.






