Pular para o conteúdo
Menu
Mix Vale

Space Force predicts 60% favorable weather for SpaceX Crew-13

Jeronimo Santos
Por 6 min de leitura
Compartilhe
Falcon 9 - SpaceX
Foto: Falcon 9 - SpaceX

The SpaceX Crew-13 mission holds a 60% probability of favorable weather conditions for its scheduled liftoff toward the International Space Station on Thursday, according to an assessment issued by the U.S. Space Force 45th Weather Squadron. Meteorologists tracking conditions along Florida’s Space Coast cited potential violations of the cumulus cloud rule and flight through precipitation as the primary concerns that could interfere with the flight window.

Publicidade

Launch teams are targeting liftoff for no earlier than 11:10 a.m. EDT (12:10 p.m. in Brasília) on Thursday, October 1, 2026, from Space Launch Complex 40 at Cape Canaveral Space Force Station. The flight represents the 13th operational crew rotation mission conducted by SpaceX for NASA under the Commercial Crew Program, carrying an international team of four spacefarers for a six-month scientific expedition aboard the orbiting laboratory.

Crew-13 astronauts complete launch dress rehearsal at Space Launch Complex 40

NASA astronaut Jessica Watkins serves as commander of the mission, joined by NASA astronaut Luke Delaney as pilot, Canadian Space Agency astronaut Joshua Kutryk as mission specialist, and Roscosmos cosmonaut Sergey Teteryatnikov as mission specialist. On Tuesday, September 29, 2026, the four crew members conducted a full dress rehearsal at the launch pad, suiting up in their specialized flight gear, riding out to the complex, and strapping inside the Crew Dragon spacecraft named Grace atop the Falcon 9 booster.

Publicidade
Ver esse post no Instagram

Um post compartilhado por SpaceX (@spacex)

“Arriving here today for us as a crew represents both kind of the culmination and the beginning of a journey for us. We’ve been training together as a crew for over a year now, so it is the culmination of all of that work and effort, and we’re so grateful to the teams of experts around the world that have gotten us prepared and ready for this,” Watkins said about the preparation timeline and arrival at the spaceport.

The flight serves as the first trip to orbit for Delaney, Kutryk, and Teteryatnikov, while Watkins is making her second voyage into space. Kutryk was originally assigned to fly on the Boeing Starliner-1 development mission, but flight planners reassigned the Canadian astronaut to the Crew-13 roster in April 2026 following ongoing technical postponements in the Boeing commercial crew schedule.

Learn more: NASA installs Artemis III rocket engines for lunar flight

Flight milestones and Falcon 9 booster recovery plans for Crew-13

Following separation from the upper stage of the Falcon 9 rocket, the Crew Dragon Grace is scheduled to fly an accelerated trajectory to reach the orbital outpost in less than nine hours. After lifting the spacecraft into low Earth orbit, the reusable first-stage booster will execute boostback and entry burns to perform a powered vertical touchdown at Landing Zone 40, located at Cape Canaveral Space Force Station.

Agency schedules indicate distinct logistical milestones guiding the operation through the coming days:

Publicidade
  • Saturday, September 26, 2026: Arrival of the four Crew-13 astronauts at Kennedy Space Center at 1:00 p.m. EDT.
  • Sunday, September 27, 2026: Rollout and vertical erection of the Falcon 9 rocket and Dragon Grace at Space Launch Complex 40, followed by the integrated static fire engine test.
  • Tuesday, September 29, 2026: Release of the 60% favorable weather forecast and execution of the integrated crew countdown rehearsal.
  • Thursday, October 1, 2026: Targeted liftoff time at 11:10 a.m. EDT from Space Launch Complex 40.
  • Friday, October 2, 2026: Backup launch opportunity at 10:47 a.m. EDT in the event that weather or technical holds abort the Thursday attempt.
  • Monday, October 5, 2026: Planned undocking and departure of the preceding SpaceX Crew-12 mission from the station following handover briefings.

Once in proximity to the space station, Dragon Grace will maneuver toward the forward-facing docking port of the Harmony module. Official agency planning documents show minor discrepancies regarding the precise docking target, with one public advisory citing an arrival near 7:00 p.m. EDT and detailed operational schedules tracking final approach and docking contact closer to 8:00 p.m. EDT on Thursday evening. A similar scheduling variance appears in official agendas for the pre-launch press conference on Wednesday, September 30, listed at 5:00 p.m. EDT by primary agency updates and at 2:30 p.m. EDT in Canadian space sector coverage.

Scientific research program planned for Expedition 75 on the orbital outpost

The arrival of Crew-13 will initiate work for Expedition 75, which features a heavy manifest of medical, biological, and materials research in microgravity over a planned six-month residency. Ground researchers intend to leverage the space environment to examine physiological degradation and cellular mechanics that cannot be replicated under normal terrestrial gravity.

“During the mission, the crew will help researchers treat heart disease and Parkinson’s disease by studying human stem-cell derived tissues that can help improve medicine, disease modeling, and pharmaceutical testing,” said Dana Weigel, manager of NASA‘s Low Earth Orbit Program at Johnson Space Center in Houston.

The mission timeline experienced earlier adjustments before hardware processing concluded at the launch site. Liftoff had been slated initially for September 12, 2026, but mission managers delayed the flight after engineers detected an oxidizer leak in the reaction control thruster assembly of the Dragon Grace capsule, requiring technicians to replace faulty valve seals and recertify system pressures.

Operational variables under review before the Thursday Falcon 9 countdown

While local atmospheric models provide a baseline probability of acceptable cloud cover at the pad, spaceflight safety rules also account for winds and oceanic conditions across the ascent corridor. Mission directors have not yet confirmed whether offshore sea states along downrange abort trajectories or local surface winds at Landing Zone 40 will impose further constraints as propellant loading approaches on Thursday morning.

If conditions force flight controllers to scrub the primary countdown, the team will stand down for 24 hours to prepare for the backup launch opportunity on Friday, October 2, 2026, at 10:47 a.m. EDT.

Publicidade

Jeronimo Santos é colaborador da redação do Mix Vale, portal de notícias com cobertura de Brasil e mundo. Produz conteúdo nas editorias de economia e benefícios, com foco em informação de serviço para o leitor brasileiro. Escreve para o portal desde 2016: Formação: Marketing

Notícias relacionadas

Mais lidas

  1. Ciência

    Meteoro no Nordeste: bólido cruza o céu de cinco estados às 21h34 e mobiliza buscas por fragmentos na Paraíba

  2. Caixa Econômica Federal

    Pé-de-Meia paga parcela de R$ 1.000,00 a aprovados no ensino médio de 2026 entre fevereiro e março de 2027

  3. Política

    Com obstrução parcial no intestino, Jair Bolsonaro é internado no hospital DF Star em Brasília

  4. INSS

    Recuperação da senha Gov.br pelo celular exige reconhecimento facial ou código por SMS para o Meu INSS

  5. EUA

    Terremoto em Los Angeles atinge magnitude 4,2 e causa tremores leves em Commerce na madrugada

  6. Matéria Publicitária

    MineMV é o novo jogo grátis de construir com blocos; veja como jogar e liberado para todas as idades

  7. Política

    Regulamentação da escala 5×2 pelo governo encarece cálculo da hora extra a partir de 16 de dezembro

  8. Santa Catarina

    Acidente de trânsito na SC-108 envolve carro e moto e deixa motociclista morto em São Ludgero

  9. Mundo

    Jornalista italiano Corrado Augias morre aos 91 anos; presidente da Itália lamenta a perda

  10. Loterias

    Rendimento de R$ 40 milhões da Mega-Sena 3088 chega a R$ 337 mil por mês no Tesouro Direto